Inspiration Station

Shuaa Al Zahra Safety Equipment Company

Review, Approval, and Design of Safety fire alarm diagram

About Service

Based on our vision to lead engineering efforts in providing a safer and more secure environment for buildings and facilities, we at “Shuaa Al Zahra Safety Equipment Company” offer a service for reviewing, approving, and designing safety fire alarm system diagrams for various commercial facilities in the Kingdom of Saudi Arabia. We strive to develop an approved and effective safety plan that safeguards and protects companies’ assets from fires. Our office provides engineering services in the field of fire protection and prevention through a team of experienced engineers specializing in safety system design across the Kingdom.

What are fire alarm system diagrams

Fire alarm diagrams are documents that demonstrate the ability of facilities or commercial buildings to handle any situation that affects the safety and security of the establishment, such as fires. The fire alarm system diagram includes fire suppression and alarm systems in the building, tailored to the space and approved architectural plans. Accredited company Shuaa Al Zahra Safety Equipment Company is responsible for designing, reviewing, and approving the certified safety plans for the building, following the submission of the required documents inKSA.

Note: Only safety plans from accredited offices are approved.

At Shuaa Al Zahra Safety Equipment Company Office, we work on designing fire sprinkler system diagrams using AutoCAD software, following the standards of the Saudi Building Code for Fire Protection (SBC 501), ensuring the highest efficiency. The design is tailored to the facility’s needs, activities, and cost-effectiveness.

What does the fire alarm system diagram include?

An evacuation plan for fire includes several fire protection elements:

Number of sprinklers

Alarm points

Emergency exits

Water hoses

Number of fire extinguishers

Ventilation systems

Mechanical systems

Electrical systems

Execution procedure

  1. The first stage begins with receiving all the required documents from the client.
  2. If there are existing safety systems, we survey what is already in place.
  3. We started designing the initial version of the safety plans with our specialized engineering team.
  4. Client’s approval of the initial version.
  5. Incorporating feedback and making revisions to the plan, followed by approval from the office.
  6. Reviewing, approving, and stamping the facility’s safety plan.
  7. In the final step, we deliver the final plan to the facility owner.

Adopting the fire fighting company "Shuaa Al Zahra Safety Equipment Company "

All fire alarm diagrams at Shuaa Al Zahra Safety Equipment Company are accredited by various government authorities, including: 

  • Civil Defense
  • General Organization for Industrial Security
  • Saudi Council of Engineers
  • Cities Authority
  • Secretariats Authority
  • Municipalities

The required documents are

  • Property title deed or lease contract
  • Building permit
  • Authorization (if the property is owned by a
  • company or institution)
  • Approved architectural plan
  • Owner’s identification
  • Operating license (if applicable)

Outputs

After reviewing and approving the fire alarm diagram, the client receives the final version, which includes:

  • Approved fire alarm system diagram for fire protection and prevention systems in the building, endorsed by our office and subsequently approved by the Civil Defense and other government entities.
  • Afterward, the systems are installed based on the approved fire sprinkler system diagram.

Why choose Our Services?

  • Extensive experience in the field
  • Specialized engineering team
  • Accredited by various government authorities
  • Commitment to agreed-upon timelines
  • High-quality service delivery
  • Competitive pricing
  • Utilization of modern technology for optimal results